Field Guides
5 sources
A concrete scan is most useful before the drill is on site and least useful after the first core is wet. Here is what to have ready, how to read the markup, and what the marks do and don't say.
Field Guides
5 sources
A trench discovers its mistakes one shovel-width at a time, in the open. A bore makes its mistakes in the dark, at depth, and tells you about them later. The locate has to be built for the difference.
Field Guides
9 sources
Ask what radar can do here and the honest answer is a question back: mesa or valley? The region's ground splits into two radar environments — and the soil surveys, not the sales brochure, explain which one your site is.
Field Guides
9 sources
A post-tensioned slab holds a large amount of stored energy in a small number of steel strands. Knowing whether you are standing on one changes how the next cut gets planned — and it is a question worth answering before the saw comes off the truck.
Field Guides
5 sources
Utility quality levels are a statement about evidence, not a ranking of effort. Each level says what was actually done to produce the information on the drawing — and the single most consequential boundary is the one between designating a utility and verifying it.
Field Guides
5 sources
Two locate reports can show the same marks and mean very different things. The difference lives in the parts people skip: the quality level, the coverage statement, and the method behind each mark.
Field Guides
5 sources
Every developed lot accumulates buried lines the way a garage accumulates boxes — steadily, quietly, and with no inventory. The ones that get hit are rarely the ones on a drawing.
Field Guides
10 sources
A free 811 ticket is the first thing you should do before you dig, and it is not the last. In both Texas and New Mexico the law that makes one-call work also draws a line around what it covers — and on most job sites that line sits at the meter.
Field Guides
6 sources
Radar does not photograph the ground. It sends a pulse, listens for reflections, and produces a record that has to be interpreted. Understanding what creates a reflection — and what kills one — tells you when GPR is the right call and when it is the wrong one.
Field Guides
8 sources
The paint and flags on a job site are a standardized language. Eight colors, each with a defined meaning, plus a set of conventions for what the marks are actually telling you about position, depth and age.
Field Guides
7 sources
Most of what slows a locate down is decided before anyone arrives. Five minutes of preparation on your end usually buys back an hour on site, and it materially changes how much of the site we can actually cover.
Field Guides
5 sources
When a public utility gets hit, a whole statutory machine engages. When a private line gets hit, there is no machine — just the property owner, the excavator, and whatever they knew and did beforehand. That difference is worth understanding before you dig, not after.
Field Guides
5 sources
Tracing a line answers “where does it run?” Fault locating answers “where along it did it go wrong?” Those are different questions, they use different techniques, and confusing them is the fastest way to dig a hole in the wrong place.