Field Guides
9 sources
Ask what radar can do here and the honest answer is a question back: mesa or valley? The region's ground splits into two radar environments — and the soil surveys, not the sales brochure, explain which one your site is.
Field Guides
7 sources
Most of what slows a locate down is decided before anyone arrives. Five minutes of preparation on your end usually buys back an hour on site, and it materially changes how much of the site we can actually cover.
Field Guides
5 sources
Every developed lot accumulates buried lines the way a garage accumulates boxes — steadily, quietly, and with no inventory. The ones that get hit are rarely the ones on a drawing.
Field Guides
10 sources
A free 811 ticket is the first thing you should do before you dig, and it is not the last. In both Texas and New Mexico the law that makes one-call work also draws a line around what it covers — and on most job sites that line sits at the meter.
Field Guides
5 sources
When a public utility gets hit, a whole statutory machine engages. When a private line gets hit, there is no machine — just the property owner, the excavator, and whatever they knew and did beforehand. That difference is worth understanding before you dig, not after.
Law & Regulation
3 sources
If your New Mexico ticketing habits were formed before April 2026, they are out of date. The Public Regulation Commission's damage prevention rules changed, and New Mexico 811 now issues ticket types that did not previously exist.